Dexmah
CPD seminar

Translating fire engineering reports into architectural design

From the report to the drawings, one building at a time.

Presented byJulio KostaFire Engineer, Dexmah
ForClient
DateDate
CompartmentsFire doorsSmoke ventsStair
About this session

By the end of the hour you can

Find what changes your drawingsin a fire strategy report
REIRead the ratingsR, E, I, Sa, s and d
Put it on the planwalls, doors, vents, distances
Spot the changesthat need the fire engineer back
Keep it consistentstrategy, drawings, schedules, spec
Format45 minutes with hands-on exercises, then 15 minutes of questions
Take awayOne-page checklist: before you issue a drawing
ScopeEngland. ADB Volume 1, 2019 edition with the 2020 to 2026 amendments, and BS 9991:2024
Agenda

Six parts, then your questions

01Why fire strategies get lost6 min
02What’s in the report5 min
03Fire ratings explained8 min
04Putting it on the plan10 min
05When the design changes6 min
06Keeping it consistent10 min
?Your questions15 min

Hands-on parts

Our example

A six-storey block of flats

Click a label on the model. Drag to turn it.

Fictional building, drawn for teaching. Illustrative.

01

Why fire strategies get lost

A requirement only gets built if it reaches the drawings.

One door’s journey

One front door, from report to site

    The resultA front door that will not hold back smoke. Every step looked reasonable.The door the strategy asked for is the door that gets built.

    Illustrative example, written for teaching.

    On real projects

    Four ways a strategy gets lost

    Composites of common issues, written for teaching. Not from any one project.

    02

    What’s in a fire strategy report

    Every section becomes something you draw, schedule or specify.

    The contents page

    Each section is something to draw

    Compartments and structure

    Pull the building apart

    Each layer is a line or a detail on your drawings, with its rating.

    03

    Fire ratings explained

    One wrong letter, and the wrong door or wall gets ordered.

    Fire resistance and reaction to fire

    What the letters mean

    Fire door ratings

    FD 30 S and E 30 Sa: same job, two tests

    BritishEuropean
    1

    Not automatically equal. Different test standards and test conditions, so a pass in one is not a pass in the other. Use the class the strategy asks for.

    Table C1 note
    2

    The whole doorset counts: frame, seals, closer, hinges, glass.

    ADB C4
    3

    From now on, specify E 30 Sa. FD 30 S leaves ADB on 2 Sep 2029.

    2029 amendments
    E 30 SaFlat front, stair and corridor cross doors. Self-closing.
    E 30Riser and duct doors. Locked, no closer.
    E 20Doors off the protected hall in a flat.
    ADB Table C1 item 2a

    A flat front door, up close

    Illustrative doorset. Gaps and seals drawn larger than life.

    ADB Vol 1, Table C1

    Fill in the rating column

    Pick a rating for each door.
    04

    Putting it on the plan

    The strategy says it in words. The plan has to show it: walls, doors, vents and distances.

    Third floor, typical

    Turn the strategy’s words into lines on the plan

    Strategy extract
    1. Each flat is a compartment. Walls between flats, and between each flat and the corridor: REI 60. ADB 3.38
    2. Stair and riser are protected shafts, REI 60.
    3. Flat entrance doors and the stair door: E 30 Sa, self-closing. Table C1 2a, 4a
    4. Riser door: E 30, kept locked. Table C1 2d
    5. Corridor vent in front of the stair door into a 1.5 m2 smoke shaft, opened on detection. ADB 3.54, 3.55, 3.57
    6. Flat door to the stair door: 7.5 m maximum. ADB Table 3.1
    ADB Vol 1, Table 3.1

    Stretch the corridor, watch the rules respond

    Simplified: doors at the centre of each frontage, distance along the corridor. Measure the real shortest route (ADB D3). "Small single stair": top storey no more than 11 m and no more than 3 storeys above the ground storey (ADB 3.32, Diagram 3.9).

    Smoke control

    Where the smoke goes

    05

    When the design changes

    Some changes break the strategy. Others only need recording.

    Decision game

    Fire engineer, or record it?

    The lawDesigners take all reasonable steps so the design, if built, would comply. Higher-risk buildings have formal change control.Reg 11K; SI 2023/909 regs 18 to 21
    06

    Keeping it consistent

    Each requirement reads the same in every document, through to handover.

    Spot the mismatch

    One fact, five documents. Which one disagrees?

    Coordination and the golden thread

    The same decisions, all the way to handover

    1Fire strategyDecisions, assumptions
    2Fire layoutsLines, ratings, vents
    3GA drawingsPlans, sections
    4Schedules, specDoors, finishes, products
    5As builtChanges recorded
    6HandoverRegulation 38

    Building Control

    Expect questions wherever the documents disagree.

    Good practice

    Higher-risk buildings

    Fire and emergency file, change control plan.

    SI 2023/909 Sch 1; regs 18 to 21
    Knowledge check

    Six questions

    Room score

    Take away

    Before you issue a drawing

    Key takeaways

    Five things to take back to the studio

    01

    Read for decisions

    Every section becomes something on a drawing.

    02

    Letters matter

    A wrong letter is a wrong product.

    03

    Draw it, don’t refer to it

    "See fire strategy" is where decisions are lost.

    04

    Layout changes are fire changes

    Stairs, corridors, flats, facades, risers.

    05

    One fact, one value

    Every document agrees, to handover.

    Thank you

    Questions?

    A strategy that needs translating onto the drawings, or a design change that needs checking: we are happy to talk it through.

    Dexmah

    Julio Kosta, Fire Engineer

    Dexmah, 9 Greyfriars Road, Reading, RG1 1NU
    0333 305 6668
    info@dexmah.com

    Sources

    References

    Approved Document B Volume 1: Dwellings, 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments (2026 amendments in effect from 30 September 2026): Section 3 (3.18, 3.27, 3.30, 3.32, 3.38, 3.39, 3.41, 3.53 to 3.57, Table 3.1, Diagram 3.2); Section 4 (Table 4.1); Section 7 (7.4, 7.5); Section 8 (8.2 to 8.8); Section 9 (9.24 to 9.27); Section 10 (10.10, 10.14, Table 10.1); Section 17; Appendix B (B6, B7, B18, B22, Table B1); Appendix C (C1 to C12, Table C1); Appendix D (D3, D5, Diagram D6, Diagram D7).

    Amendments to Approved Document B, published September 2024, taking effect 2 September 2029: removal of national classes for fire resistance.

    BS 9991:2024, Fire safety in the design, management and use of residential buildings. Code of practice. Clause 0.8; Annex F, F.5.2.

    Building Regulations 2010, SI 2010/2214, regulations 2B(p), 11K and 38, as amended by SI 2023/911.

    Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, SI 2023/909, regulations 18 to 21 and Schedule 1.

    Higher-Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023, SI 2023/275.

    Regulation 38 Fire Safety Information for Architectural Designers, Dexmah CPD for GBS Architects, 15 October 2026.

    The example building, its drawings, doorset and smoke visuals are fictional and illustrative, made for teaching.