Translating fire engineering reports into architectural design
From the report to the drawings, one building at a time.
By the end of the hour you can
Six parts, then your questions
Hands-on parts
A six-storey block of flats
Click a label on the model. Drag to turn it.
Fictional building, drawn for teaching. Illustrative.
Why fire strategies get lost
A requirement only gets built if it reaches the drawings.
One front door, from report to site
Illustrative example, written for teaching.
Four ways a strategy gets lost
Composites of common issues, written for teaching. Not from any one project.
What’s in a fire strategy report
Every section becomes something you draw, schedule or specify.
Each section is something to draw
Pull the building apart
Each layer is a line or a detail on your drawings, with its rating.
Fire ratings explained
One wrong letter, and the wrong door or wall gets ordered.
What the letters mean
FD 30 S and E 30 Sa: same job, two tests
Not automatically equal. Different test standards and test conditions, so a pass in one is not a pass in the other. Use the class the strategy asks for.
Table C1 noteThe whole doorset counts: frame, seals, closer, hinges, glass.
ADB C4From now on, specify E 30 Sa. FD 30 S leaves ADB on 2 Sep 2029.
2029 amendmentsA flat front door, up close
Illustrative doorset. Gaps and seals drawn larger than life.
Fill in the rating column
Putting it on the plan
The strategy says it in words. The plan has to show it: walls, doors, vents and distances.
Turn the strategy’s words into lines on the plan
- Each flat is a compartment. Walls between flats, and between each flat and the corridor: REI 60. ADB 3.38
- Stair and riser are protected shafts, REI 60.
- Flat entrance doors and the stair door: E 30 Sa, self-closing. Table C1 2a, 4a
- Riser door: E 30, kept locked. Table C1 2d
- Corridor vent in front of the stair door into a 1.5 m2 smoke shaft, opened on detection. ADB 3.54, 3.55, 3.57
- Flat door to the stair door: 7.5 m maximum. ADB Table 3.1
Stretch the corridor, watch the rules respond
Simplified: doors at the centre of each frontage, distance along the corridor. Measure the real shortest route (ADB D3). "Small single stair": top storey no more than 11 m and no more than 3 storeys above the ground storey (ADB 3.32, Diagram 3.9).
Where the smoke goes
When the design changes
Some changes break the strategy. Others only need recording.
Fire engineer, or record it?
Keeping it consistent
Each requirement reads the same in every document, through to handover.
One fact, five documents. Which one disagrees?
The same decisions, all the way to handover
Building Control
Expect questions wherever the documents disagree.
Good practiceHigher-risk buildings
Fire and emergency file, change control plan.
SI 2023/909 Sch 1; regs 18 to 21Regulation 38
As-built fire plans come from these drawings.
Reg 38; ADB 17.4, 17.5Six questions
Before you issue a drawing
Five things to take back to the studio
Read for decisions
Every section becomes something on a drawing.
Letters matter
A wrong letter is a wrong product.
Draw it, don’t refer to it
"See fire strategy" is where decisions are lost.
Layout changes are fire changes
Stairs, corridors, flats, facades, risers.
One fact, one value
Every document agrees, to handover.
Questions?
A strategy that needs translating onto the drawings, or a design change that needs checking: we are happy to talk it through.
Julio Kosta, Fire Engineer
Dexmah, 9 Greyfriars Road, Reading, RG1 1NU
0333 305 6668
info@dexmah.com
References
Approved Document B Volume 1: Dwellings, 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments (2026 amendments in effect from 30 September 2026): Section 3 (3.18, 3.27, 3.30, 3.32, 3.38, 3.39, 3.41, 3.53 to 3.57, Table 3.1, Diagram 3.2); Section 4 (Table 4.1); Section 7 (7.4, 7.5); Section 8 (8.2 to 8.8); Section 9 (9.24 to 9.27); Section 10 (10.10, 10.14, Table 10.1); Section 17; Appendix B (B6, B7, B18, B22, Table B1); Appendix C (C1 to C12, Table C1); Appendix D (D3, D5, Diagram D6, Diagram D7).
Amendments to Approved Document B, published September 2024, taking effect 2 September 2029: removal of national classes for fire resistance.
BS 9991:2024, Fire safety in the design, management and use of residential buildings. Code of practice. Clause 0.8; Annex F, F.5.2.
Building Regulations 2010, SI 2010/2214, regulations 2B(p), 11K and 38, as amended by SI 2023/911.
Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, SI 2023/909, regulations 18 to 21 and Schedule 1.
Higher-Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023, SI 2023/275.
Regulation 38 Fire Safety Information for Architectural Designers, Dexmah CPD for GBS Architects, 15 October 2026.
The example building, its drawings, doorset and smoke visuals are fictional and illustrative, made for teaching.